With so many Crown Point houses built in the last twenty-five years, the first question about a foundation problem is sometimes legal: is the builder still on the hook? This page summarizes what the Indiana Code says and what the city asks of contractors. It is a plain summary, not legal advice; a lawyer can apply it to your papers.

Ask for a foundation visitRead the FAQ

Under Indiana Code 32-27-2-8 a builder may warrant a new home for two years against faulty workmanship and materials and for ten years against major structural defects, counted from first occupancy. Before suing a builder over a construction defect, an owner must serve written notice at least 60 days ahead.

Curving street of newer two-story homes with attached garages and young trees on an overcast early spring day
Newer two-story homes of the kind that may still fall within a builder's warranty period.

What can an Indiana builder warrant?

Section 32-27-2-8 lets a builder give the first buyer of a new home four promises: two years free of defects from faulty workmanship or materials; two years free of defects from faulty installation of plumbing, electrical, heating, cooling and ventilating systems; four years for the roof; and ten years free of major structural defects. The warranty date is when the house was first lived in. These warranties survive a sale, so a second owner may still be covered. They are optional for the builder, so the purchase contract decides whether they apply.

What counts as a major structural defect?

Section 32-27-2-3 defines it as actual damage to the load-bearing part of a new home, including damage from subsidence, expansion or lateral movement of the soil that affects the load-bearing function. Soil movement caused by a flood, earthquake or other natural disaster is excluded. A cosmetic crack is not the same as damage to the load-bearing structure, which is why measurements and, where needed, an engineer's report matter.

The notice owed before a lawsuit

Indiana's notice and opportunity to repair law, Section 32-27-3-2, requires a homeowner to serve a written notice of claim on the construction professional at least 60 days before filing a construction defect action, describing the defect in reasonable detail. The builder then has 21 days to respond by proposing an inspection, offering to settle, or disputing the claim. Keep dated photos and measurements from the start.

Hiring someone else: city license and contract

The City of Crown Point requires every contractor and subcontractor on a building permit application to hold a current city license, issued through the Clerk-Treasurer, whose checklist includes a bond recorded in Lake County. The Indiana Attorney General says home improvement contracts over $150 must be in writing and should list the price, payment schedule, work and materials, dates and the contractor's contact details, and suggests keeping any deposit to a third of the price or less. Prices to compare against are on the Crown Point cost guide.

Tell a local specialist what you see

A crack that showed up after the first winter, a basement that seeps every April, a garage floor that dropped: describe it in a line or two. One independent foundation and waterproofing specialist who covers Crown Point reads it.

What's going on?

Only the local specialist gets it, to reach you about this.

Free to ask. No obligation. Many local specialists don't charge for the first visit; ask when they call.

This site is run by a referral service that is paid by the specialists it connects you with. Asking costs you nothing.

A local foundation specialist who serves Crown Point will call you back. Your request goes to that one independent specialist, not a list. By sending this you agree they may call or text you about it. Privacy.

Request Ask for a foundation visitSee prices